I finished some of the schematic, and had to work on footprint palcement. I think i have gotten more effecient at them, hopefully i can do the nxt two soon. i finished the footpring and it required a lot more stuff cause of how many heyboard switches there were. either way i locked in. I think theres a bit of inflation tho. meow
Comments 1
whoa he did a devlog
Sign in to join the conversation.