E&A Electrical Connections
- 2 Devlogs
- 14 Total hours
Website for startup.
Website for startup.
Finished the entire “home” page (total website is 2 webpages) except for footer. Added ui changes based on width of the window for everything. I intend to add animations and the next webpage (and be done) by the next dev log
Finished the UI for Installations, Code Compliance, and Inspections.