You are browsing as a guest. Sign up (or log in) to start making projects!

4h 23m logged

DFM for the CNC machine

I have an existing concept design for the machine that i spent about 30 hours on over at fallout. While i am satisfied with the architecture of the design and in theory it could be shipped, i’m not happy with how it goes together and how sloppy the design is, so i’m doing a second pass from the ground up, and designing everything so it’s clean and easy to assemble.
I’m currently working on the motion system and the frame - once i’m done with that i’m going to move onto all of the secondary systems such as the chip collector, electronics bay, doors, and control panel.
I do need to re run the FEA on the motion system once complete as there have been significant changes in the structure (for the better)

0
6

Comments 0

No comments yet. Be the first!