You are browsing as a guest. Sign up (or log in) to start making projects!

1h 30m logged

so welpsies i spent time iterating on my pipe holder design, a few things i wanted to do were to add top and bottom mounting holes, and also remove some of the sides stuff so it is much less noisy. i aded in the bottom mounting holes fairly easy, but i learnt more about what overhangs 3dps can hanldle from the top. i also had to hollow out a lot of the holder to make less friction with the pipe which should directly equal less noise.

i also kinda did my first onshape assembly, i already printed my rack and pinion stuff and knew it worked, but i kinda did it in onshape for the learning expereince. its actually pretty interesting and REALLY satisfying. i had to learn about different types of mate connectors which was pretty cool. here i have a screenshot.
Total time spent: 90 mins

0
4

Comments 0

No comments yet. Be the first!