You are browsing as a guest. Sign up (or log in) to start making projects!

1h 12m logged

Finished the entire gantry (except later modifications for HGH blocks) :miku-plush:

Changes:

  • screws added to every single part (around 138 fasteners currently… my poor loctite bottle)
  • small 3d printed part added to make sure the y axis stepper doesn’t move
  • improvements to brace structure
    -fixed the pocketing
    -made small extrusion so the sfu nut housing doesn’t make contact
  • fixed small parts not being centered (sfu nut housings)

What’s Next:

  • finish adding linear rails to gantry
  • figure out base material (i.e. concrete filled aluminum extrusion, epoxy granite filled aluminum extrusion
  • finalize bed size (i’ve changed it like 3 times already)
  • Design base
  • add enclosure so I don’t have to clean as often
  • fix the screw sizing (I have like 10 different screws atp 😭)
  • figure out how my hand isn’t gonna break when assembling this
0
13

Comments 0

No comments yet. Be the first!