D E V L O G # 2
⠀
BUILDING THE BASE
⠀
Alright, quick update again haha.
⠀
The first servo fit gauge was too loose, so I measured the servo again and made a new one with a 23.4 × 12.4 mm opening. This one fit much better.
⠀
After I finished that, I measured the mounting holes and figured out the correct position for the servo shaft.
⠀
Then, I started designing the actual base. I made the circular housing, added the servo opening and mounting holes, built a 30 mm support wall, and added a notch for the servo wire. - (PLEASE let me know if you have any suggestions)
⠀
The fixed part of the base is basically finished.
⠀
NEXT: Designing the rotating platform.
Comments 0
No comments yet. Be the first!
Sign in to join the conversation.