One of the last steps. A small step for y’all but a big one for me. The filter system is done, I designed them and added the mounting. Now I need to find some magnets with a 10mm diameter and a threaded rod attached. The last things are the ventilation and the cable routing. Btw if someone followed the last logs you can see a huge diffrence, I was on vacation and had my laptop with me, and I didn’t have internet. So I couldn’t upload lapses. Smt around 40h are missing but they are in the fusion time tracker (it’s a add-on if someone cares). So yeah that’s it.
Comments 0
No comments yet. Be the first!
Sign in to join the conversation.